Waterproof decoration acceptance notice

1, before the waterproof wall treatment: brushing the surface layer of the waterproof layer, shall not be uneven, loose, hollowing, sanding, cracking and other defects.
2, waterproof height: generally require shower area, high 180cm above, non-shower area more than 30cm.
3, in advance with the foreman and tile master confessions must be done to close the water test, especially the kitchen. Some kitchens have put on a wall tile during the water-retention test. The reason is that the tile-laying master thinks that there is no need to close the water in the kitchen (as many masters still think that the kitchen does not need to be waterproof, but some kitchens often have leaks downstairs, so it is still necessary to do something ).
4, must advance with the foreman and the tile master to explain the closed water test, we must inform our owners in advance.
The reason is that we can contact the neighbors downstairs. For example, when my family first made waterproof work, the worker’s master did not tell me, and when I arrived, I went downstairs to find my neighbor. When the neighbor was not at home, I asked other neighbors to know that their family was on vacation. It will only return after months.
5. It is suggested that everyone should go to the neighbor's house downstairs after 2 hours when they start to do the water-blocking test.
The reason is that there is a problem with the closure of water. If there is leakage, it will not cause great damage to the neighbors. If there is no problem, it will be watched again after 24 hours.

Decoration waterproof hydropower reform kitchen wall tiles

Kids Finials

Brushed Nickel Curtain Rod,Rustproof Curtain Rod,Adjustable Curtain Rod

Baihong Hardware Co., Ltd. , http://www.hz-curtainrod.com

Posted on